
Capabilities
One contractor across the electrical and renewable infrastructure
Greentech designs, installs, tests and certifies the electrical infrastructure that renewables depend on — then stays involved as those assets age.
Five capabilities, one delivery team, and an asset-care service that closes the loop.
- Certification
- NICEIC · BAFE · MCS
- Coverage
- Central Belt & Scotland
- Asset care
- RCR from £295 + VAT

Commercial fit-out, power and services
Priority capability
Commercial electrical
Distribution, power, containment, lighting and controls for commercial and industrial sites — tendered as a standalone package, or integrated with the renewables and asset-care scope around it.
- LV distribution, sub-mains and protection
- Containment, cabling and fit-out packages
- Testing, certification and handover evidence

Generation
Commercial solar PV
Generation designed against your demand, your roof and your network connection — then inspected and reported on as the asset ages.
Modelling · G98 / G99 · Installation · RCR
Commercial solar PVIntegrated infrastructure
Storage and charging, designed with the supply
Both capabilities begin with the same question: what can this site actually support? The answer decides the design, the phasing and the cost.
- 01
Battery storage
Storage sized against the load profile and designed into the site's protection, siting and fire strategy.
Feasibility · Connection · IntegrationView capability - 02
EV infrastructure
Commercial charging delivered as an electrical project: capacity, distribution, civil works and load management.
Capacity · Distribution · CommissioningView capability
Also delivered
The disciplines that hold a building together
Delivered alongside the electrical package, or as a standalone requirement.

Greentech RCR
Generating doesn't mean performing.
Solar PV, battery storage and EV charging are long-term assets. Greentech RCR gives owners structured visibility of what they already have, how it is holding up, and which actions need attention.
- Domestic
- £149 + VAT
- Commercial
- From £295 + VAT

Next step
Tell us what the site needs to do
New infrastructure, a tender package or a renewable asset already in service — the starting point is the same conversation.

