Skip to content
GreentechScotland
Renewable energy infrastructure across a Scottish site

Grants & funding

Energy grants and funding

Find out what support could be available. Funding and financial support may be available for eligible homes, landlords, businesses and organisations considering energy-efficiency improvements, renewable technologies and EV charging.

Greentech helps customers understand the available routes, assess technical suitability and deliver professionally designed, compliant installations across Scotland.

Or book a surveyFunding decided by the funding body — never by us

Start where you are

Six routes in, depending on who you are

The funding that applies to a homeowner is not the funding that applies to a depot. Pick the closest description and we will show you what exists, what it depends on and what to do next.

Current published information

Funding routes we are actively tracking

Every card below comes from one central funding database, so a change of date or status updates the whole site at once. Where a window has closed, the card says so.

Interest-free loan and cashback

Active

Business Energy Scotland SME loan and cashback

An interest-free loan route for Scottish small and medium-sized businesses and charities installing energy-efficiency or renewable measures, with cashback support where the scheme offers it. The assessment and approval sit with the scheme.

Designed for
Business, Charity, Landlord
Potential support
Loan and cashback levels are set by the scheme. Confirm current published terms.
Key considerations
Scottish SMEs, charities and some landlords, with an eligible measure, a technical assessment and approval from the scheme. Loan terms and cashback availability are set by the scheme.

Government chargepoint grant

Active

EV chargepoint grant for households with eligibility requirements

A grant route for people who rent, or who own a flat, and who therefore cannot use the standard homeowner chargepoint grant. It contributes towards an eligible chargepoint at a property with eligible private parking.

Designed for
Tenant, Flat owner
Potential support
Up to 350 pounds per eligible chargepoint, within published scheme limits.
Key considerations
Renters and flat owners, with off-street private parking at the property, an eligible vehicle, permission from the landlord or freeholder where required, and an eligible installer. The grant must be approved before installation starts.

Government grant and interest-free loan

Active

Home Energy Scotland Grant and Loan

The Scottish Government's main domestic route for clean heating and energy efficiency, administered through Home Energy Scotland. Grant support and interest-free loan funding may be available for qualifying measures, and the funding body - not Greentech - decides eligibility.

Designed for
Homeowner, Landlord
Potential support
Grant and loan levels are set by the funding body and vary by measure. Confirm the current published levels with Home Energy Scotland.
Key considerations
Scottish homeowners and some landlords, where the property and the proposed measure meet the scheme's own technical rules. An assessment and a quote from an eligible installer normally form part of the process.

Government chargepoint grant

Active

Workplace Charging Scheme

A voucher-based grant for eligible organisations installing chargepoints for staff and visitors. The organisation applies, receives a voucher, and then books an eligible installer within the voucher period.

Designed for
Business, Charity, Public-sector organisation, School / education provider, Fleet operator
Potential support
350 pounds per eligible socket, up to the published socket cap per applicant.
Key considerations
Eligible registered businesses, charities and public-sector organisations, with off-street parking, designated staff or fleet use, and an eligible installer. Charging is not permitted to be used to generate revenue from the general public under the scheme rules.

Funding where you are

Glasgow and Edinburgh

The schemes are national. What decides whether they are realistic is the building, the street and who has to agree to the work. These pages set out the local position for each city.

How it works

Funding is one line in a project, not the project

We check the technical position first and the funding second, because a grant cannot fix a supply that cannot carry the load, a roof that cannot take the array, or a scheme that closed last month.

Check funding eligibility
  1. Step 1

    Check the routes

    Answer a few questions and we will name the funding routes worth investigating — and say plainly where one is closed.

  2. Step 2

    Technical survey

    We survey the property or site: supply capacity, roof, fabric, parking, containment. Suitability decides more than funding does.

  3. Step 3

    Design and application

    A designed scope and quote in the form the scheme's application needs, with the sequence and approvals set out.

  4. Step 4

    Install and hand over

    Installation, testing, commissioning and certification — then maintenance or a condition report when it is due.

Scotland specifically

Scottish routes work differently

Home Energy Scotland, Warmer Homes Scotland, supplier obligations, landlord loans, business loans and public-sector funding each have their own applicant, their own process and their own rules. We keep them in one place, with the date each was last checked.

Questions we are asked about funding

More answers about how we work

Why we do not quote a single headline figure

Scheme levels are revised, and a figure that has moved on is worse than no figure — it changes what you expect to pay. Every route we publish carries the date a person last checked it, and links to the funding body's own page.

Already have renewable assets?

Funding is not the only opportunity. Understanding the condition, safety and performance of existing solar, battery or charging assets could identify problems, risks and optimisation opportunities — particularly where an installation has never been independently inspected.

Explore the Renewable Condition Report