Multi-Storey Residential Electrical Infrastructure | Edinburgh
Design input, electrical installation, testing and coordinated project delivery across occupied residential tower blocks
- Location
- Edinburgh, Scotland
- Sector
- Public Sector / Residential
- Customer
- Harmony Fire Ltd
- Programme environment
- City of Edinburgh Council residential tower blocks
- Greentech role
- Electrical Installation Contractor
- Status
- Completed
Project overview
Greentech (Scotland) Ltd was appointed by Harmony Fire Ltd to deliver electrical works associated with a wider fire-safety programme across occupied residential tower blocks in Edinburgh.
The programme included works at Northview, Greendykes, Wauchope, Fidra, Birnies and Kirkgate. Greentech's role involved the installation and coordination of electrical infrastructure and associated equipment within live residential environments.
The works required more than straightforward installation. As existing-site conditions and technical constraints were encountered, Greentech provided practical design input, supported the development of workable solutions and revised electrical schematic drawings to reflect the agreed installation requirements.
Throughout delivery, particular attention was given to safe access, resident considerations, site security, good housekeeping, coordination with the wider project team and minimising disruption within occupied buildings.
The project requirement
The project required Greentech to deliver coordinated electrical works supporting the wider life-safety programme while working within existing, occupied residential buildings. Greentech's responsibilities included:
- Electrical infrastructure installation
- Installation and connection of associated system equipment
- Plant-room electrical works
- Electrical containment
- Distribution and switchgear interfaces
- Generator connection works
- Small power and lighting
- Trace-heating supplies
- Design coordination and technical input
- Electrical schematic drawing revisions
- Checks, inspection and testing
- Identification and rectification of installation issues
- Commissioning attendance and handover support
Design input and proactive problem-solving
As the programme progressed, conditions encountered within the existing buildings required elements of the electrical installation information to be reviewed and developed.
Greentech did not approach the project solely as an installation exercise. The team assessed the electrical and physical constraints encountered on site, provided practical technical input and worked with the wider project team to develop suitable solutions.
Where changes were required, Greentech contributed to revisions of the electrical schematic drawings so that the installation information reflected the actual site conditions and the agreed technical approach.
This proactive involvement helped the programme move forward without allowing site-specific challenges to become unnecessary delays or unresolved installation issues.
Greentech's project scope
Electrical infrastructure
Greentech delivered electrical infrastructure and associated system connections across the programme, including containment, cabling, distribution interfaces, plant-room services and supporting electrical installations.
Plant-room electrical works
The project scope included electrical works supporting plant-room equipment, distribution, switchgear interfaces, small power, lighting, trace heating and generator connections.
Design coordination
Greentech reviewed project information against actual site conditions, provided technical input where issues were identified and supported revisions to electrical schematic drawings.
Testing and quality control
Greentech undertook the required checks and testing, identified and addressed installation issues, maintained quality control and supported the project through completion.
Commissioning and handover
The Greentech team attended and supported commissioning and handover activities as the electrical works were completed and brought into service.
Project challenges
- 01
Occupied residential buildings
The works were delivered within occupied tower blocks. Access, resident safety, working areas, housekeeping and end-of-shift security therefore required careful daily management. Greentech organised the works to maintain safe access and minimise unnecessary disruption to residents while allowing the installation programme to progress.
- 02
Existing-site conditions
The existing buildings presented physical and electrical conditions that could not always be fully resolved through the original project information alone. Greentech reviewed the issues as they emerged, contributed practical technical input and supported the development of revised schematic information and workable installation solutions.
- 03
Multi-site project delivery
The programme extended across a number of residential tower blocks. Greentech was required to maintain consistent installation, safety and quality standards while responding to the conditions encountered at each location.
- 04
Coordination with the wider project team
The electrical works had to be sequenced alongside the wider life-safety programme and coordinated with Harmony Fire Ltd, site representatives and other project personnel. Clear communication and timely technical input were important to resolving interface issues and keeping the works progressing.
- 05
Live electrical and life-safety infrastructure
The installation formed part of a wider programme involving critical building systems. Electrical interfaces, testing, issue resolution and commissioning therefore required controlled delivery and appropriate technical coordination.
Our approach
- 01
Survey and design review
Greentech reviewed the project requirements against the conditions encountered within the existing buildings. Where discrepancies or installation constraints were identified, Greentech assessed the implications, provided design input and supported the revision of electrical schematic drawings to reflect the agreed solution.
- 02
Planning and coordination
The team planned labour, materials, access and daily installation activities around the requirements of occupied residential properties. Greentech coordinated with Harmony Fire Ltd and the wider project team to sequence the electrical works alongside other programme activities.
- 03
Installation
The electrical infrastructure and associated equipment were installed in accordance with the developed project information and agreed technical requirements. Where site-specific issues were encountered, Greentech proactively worked through the technical and practical implications rather than allowing problems to remain unresolved.
- 04
Testing and compliance
Greentech's responsibilities included checks, inspection, testing, quality control, identification and resolution of installation issues, and completion records.
- 05
Commissioning and handover
Greentech supported the commissioning and handover process, helping take the electrical works from installation through testing, close-out and final completion.
Project outcome
The completed programme demonstrates Greentech's ability to deliver:
- Coordinated electrical works within occupied residential properties
- Electrical infrastructure supporting wider life-safety installations
- Practical design input and schematic drawing development
- Plant-room distribution and associated electrical services
- Multi-site project planning and delivery
- Technical problem-solving within existing buildings
- Testing, issue resolution and commissioning support
- Effective coordination with contractors and wider project teams
- Controlled delivery within sensitive public-sector environments
Greentech project statement
Understand the infrastructure, identify the issue, develop the solution and deliver the completed installation.
Capability
Proven electrical delivery supporting wider energy infrastructure
The infrastructure discipline this programme demanded — understanding an existing electrical system, resolving the constraints within it and delivering the installation — is the same discipline behind our commercial electrical and renewable-energy work, including reactive electrical works when a live building needs attendance.
Commercial Electrical
Electrical infrastructure, distribution, power, lighting, controls, containment, testing and project delivery.
Commercial EV Charging
Workplace and fleet EV charging supported by electrical-capacity assessment, infrastructure design, installation and commissioning.
Solar PV and Battery Storage
Commercial renewable-energy systems designed around the existing electrical infrastructure and operational requirements of each site.
Electrical Maintenance and Reactive Works
Planned maintenance, compliance support, fault response, remedial work and electrical asset care.
This Edinburgh programme did not include EV charging, Solar PV or battery storage. The connection is Greentech's proven ability to understand and deliver the underlying electrical infrastructure upon which these technologies depend.
More projects
Other delivered work

Lighting & controls
£1.1 million
Union Square Aberdeen
Retail illumination and intelligent control
A full lighting infrastructure overhaul across malls, atriums and car parks, controlled from a central head-end so the facilities team has addressable control of every fitting.
AberdeenView case study
Lighting & controls
£635,000
Edinburgh Quay 1
Commercial LED and smart control retrofit
A multi-floor lighting upgrade across a prominent Edinburgh office development, replacing legacy fluorescent with LED and moving the building from always-on to demand-driven control.
EdinburghView case study
Infrastructure renewal
£420,000
Thistle Shopping Centre
Infrastructure renewal and smart lighting
A full electrical strip-out and re-cable with a new DALI-controlled lighting system, replacing degraded legacy wiring in the ceiling voids of a live shopping centre.
StirlingView case study
Your project
Planning a Commercial Electrical or Energy Infrastructure Project?
Greentech delivers commercial electrical projects across Scotland, from electrical infrastructure, distribution and refurbishment through to EV charging, Solar PV and battery storage.
One contractor. Complete project delivery.
Greentech ScotlandBuilt for today. Engineered for what comes next.