Forth Valley View — Principal electrical contractor, multi-phase development

Electrical · New build residential

Forth Valley View

Principal electrical contractor, multi-phase development

Principal electrical contractor across a multi-phase development, from DNO intake and final circuits through to hardwired life safety and roof-mounted solar PV on specified plots.

Client
Persimmon Homes (East Scotland)
Location
Shieldhill, Falkirk
Role
Principal electrical contractor

The brief

Principal electrical contractor across a multi-phase development, from DNO intake and final circuits through to hardwired life safety and roof-mounted solar PV on specified plots.

Client challenge

A multi-phase development needs an electrical partner who can hold safety and quality standards across a long programme, with several trades and phases running at once, while keeping documentation complete for every plot.

Delivery

Delivered phase by phase with consistent handover dates. Greentech's site controls contributed to the development winning Persimmon Homes' national Health, Safety and Environment award.

Greentech approach

  • 01

    Process-driven project management with on-site safety and environmental controls treated as part of delivery, not an overhead.

  • 02

    Renewable integration designed into the electrical package rather than retrofitted later.

Engineering scope

  • DNO intake connections through to final circuitry and testing of each plot.
  • Consumer units with protective devices to BS 7671.
  • Hardwired interlinked fire, smoke and carbon monoxide detection in every property.
  • LED lighting circuits throughout.
  • Roof-mounted solar PV on specified plots, connected, tested and certified.

Outcomes

  • Safety recognised

    Site controls contributed to the development winning Persimmon's national HSE award.

  • Statutory compliance

    BS 7671 compliance and Scottish-legislation interlinked detection in every home.

  • Renewables included

    Solar PV installed and certified on specified plots.

The lifecycle view

Solar PV installed on these plots is exactly the kind of asset that will need condition evidence as it ages — the case for an RCR later in the estate's life.