Electrical · New build residential
Forth Valley View
Principal electrical contractor, multi-phase development
Principal electrical contractor across a multi-phase development, from DNO intake and final circuits through to hardwired life safety and roof-mounted solar PV on specified plots.
- Client
- Persimmon Homes (East Scotland)
- Location
- Shieldhill, Falkirk
- Role
- Principal electrical contractor
The brief
Principal electrical contractor across a multi-phase development, from DNO intake and final circuits through to hardwired life safety and roof-mounted solar PV on specified plots.
Client challenge
A multi-phase development needs an electrical partner who can hold safety and quality standards across a long programme, with several trades and phases running at once, while keeping documentation complete for every plot.
Delivery
Delivered phase by phase with consistent handover dates. Greentech's site controls contributed to the development winning Persimmon Homes' national Health, Safety and Environment award.
Greentech approach
- 01
Process-driven project management with on-site safety and environmental controls treated as part of delivery, not an overhead.
- 02
Renewable integration designed into the electrical package rather than retrofitted later.
Engineering scope
- DNO intake connections through to final circuitry and testing of each plot.
- Consumer units with protective devices to BS 7671.
- Hardwired interlinked fire, smoke and carbon monoxide detection in every property.
- LED lighting circuits throughout.
- Roof-mounted solar PV on specified plots, connected, tested and certified.
Outcomes
Safety recognised
Site controls contributed to the development winning Persimmon's national HSE award.
Statutory compliance
BS 7671 compliance and Scottish-legislation interlinked detection in every home.
Renewables included
Solar PV installed and certified on specified plots.
The lifecycle view
Solar PV installed on these plots is exactly the kind of asset that will need condition evidence as it ages — the case for an RCR later in the estate's life.
More projects
Other delivered work

Lighting & controls
£1.1 million
Union Square Aberdeen
Retail illumination and intelligent control
A full lighting infrastructure overhaul across malls, atriums and car parks, controlled from a central head-end so the facilities team has addressable control of every fitting.
AberdeenView case study
Lighting & controls
£635,000
Edinburgh Quay 1
Commercial LED and smart control retrofit
A multi-floor lighting upgrade across a prominent Edinburgh office development, replacing legacy fluorescent with LED and moving the building from always-on to demand-driven control.
EdinburghView case study
Infrastructure renewal
£420,000
Thistle Shopping Centre
Infrastructure renewal and smart lighting
A full electrical strip-out and re-cable with a new DALI-controlled lighting system, replacing degraded legacy wiring in the ceiling voids of a live shopping centre.
StirlingView case study

Your project
Talk about a project with the same constraints
Tell us the site, the programme and what has to stay running.